Canoe building
Building a Selway Fisher 15 foot prospector canoe
 
          
          
        
      Port Gaverne launch
 
          
          
        
      The plans
 
          
          
        
      gathering the tools
 
          
          
        
      Lofting the plans onto 4 sheets of gaboon marine ply
 
          
          
        
      cutting out the 28 planks
 
          
          
        
      planing edges of planks
 
          
          
        
      scarf jointing the planks together
 
          
          
        
      more clamps required
 
          
          
        
      loosely arranging planks
 
          
          
        
      starting to loosely stitch the planks together
 
          
          
        
       
          
          
        
      centre board mould to shape planks around
 
          
          
        
       
          
          
        
      taking shape
 
          
          
        
      The bow
 
          
          
        
      bow loosely stitched
 
          
          
        
       
          
          
        
       
          
          
        
      showing cable tie stitching
 
          
          
        
      bulkhead (Anthea painting board)
 
          
          
        
      clamping bow into shape
 
          
          
        
       
          
          
        
      Filleting the joints with epoxy filler
 
          
          
        
      bulkhead
 
          
          
        
       
          
          
        
       
          
          
        
       
          
          
        
      deck made partly from an old cupboard I made as a student
 
          
          
        
      clamping and screwing the gunwales
 
          
          
        
       
          
          
        
       
          
          
        
      Finishing the deck to a soundtrack by Paul
 
          
          
        
      The stern
 
          
          
        
      air release bung
 
          
          
        
      primer
 
          
          
        
      4 coats of Donegal Green topcoat
 
          
          
        
      4 coats of varnish on the decks and gunwales
 
          
          
        
      A seat made from some old Gul webbing
 
          
          
        
      Inside painted off white
 
          
          
        
      Detaiing and air pressure release valve.
 
          
          
        
      Ye olde canoe builder
 
          
          
        
      Seat and yoke bolted in
 
          
          
        
      second seat in Cornish colours
 
          
          
        
      Finished!
 
          
          
        
      named Keskorra, Cornish for put together
 
          
          
        
      Launched at Port Gaverne for first sea trials